Hefei Metro Line 8 Starts from Yilijing Station to Beicheng High-speed Railway Station

Read Time:31 Second

The feasibility study report of the first phase of Hefei Rail Transit Line 8 was officially approved by the Provincial Development and Reform Commission.

The line starts from the existing Line 3 Yilijing Station, and is laid along Fuyang North Road, Qinghe Road, Mengcheng North Road, Xinglong Road, Fuyang North Road, Tangdu Road, Fenglin Road, and ends at Beicheng High-speed Railway Station. The 22.5 kilometers are all underground lines with 12 stations in total. The line adopts a communication-based mobile block train control system (CBTC), which has the function of realizing fully automatic operation, with a maximum speed of 100 km/h.

Happy
Happy
0 %
Sad
Sad
0 %
Excited
Excited
0 %
Sleepy
Sleepy
0 %
Angry
Angry
0 %
Surprise
Surprise
0 %

Average Rating

5 Star
0%
4 Star
0%
3 Star
0%
2 Star
0%
1 Star
0%

Leave a Reply

Previous post March 3: Daily Briefing on Novel Coronavirus Cases in China
Next post Students not getting enough sleep, says report
Spin to Win!
Kindly get back to your previous orientation view... your wheel is rolling there...

You have won free points
500RMB for Drunk Malt Connect Lucky Draw GoodLuck!
You have a chance to win . Play ONLY once ? Give it a spin.
* You can spin the wheel only once daily.
You must login to play mycred fortune wheel

*

*

*

*

*